Dezignare Interior Design Collective Vol. 9.2

Construction Specifications Institute
CSI MasterFormat(TM) Divisions

 
The Construction Specifications Institute (CSI) develops technical documents, formats, guidelines, and education programs to foster clear written communication among architects, engineers, specifiers, contractors, product suppliers and owners.

GENERAL DIVISIONS

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
      Division 00 - Procurement and Contracting Requirements

SPECIFICATIONS GROUP
   GENERAL REQUIREMENTS SUB-GROUP

      Division 01 - General Requirements

   FACILITY CONSTRUCTION SUB-GROUP
      Division 02 - Existing Conditions
      Division 03 - Concrete
      Division 04 - Masonry
      Division 05 - Metals
      Division 06 - Wood, Plastic, Composites
      Division 07 - Thermal & Moisture Protections
      Division 08 - Openings
      Division 09 - Finishes
      Division 10 - Specialties
      Division 11 - Equipment
      Division 12 - Furnishings
      Division 13 - Special Construction
      Division 14 - Conveying Equipment
      Division 15 - RESERVED
      Division 16 - RESERVED
      Division 17 - RESERVED
      Division 18 - RESERVED
      Division 19 - RESERVED

   FACILITY SERVICES SUB-GROUP
      Division 20 - RESERVED
      Division 21 - Fire Suppression
      Division 22 - Plumbing
      Division 23 - Heating, Ventilating & Air-Conditioning
      Division 24 - RESERVED
      Division 25 - Integrated Automation
      Division 26 - Electrical
      Division 27 - Communications
      Division 28 - Electronic Safety & Security
      Division 29 - RESERVED

   SITE AND INFRASTRUCTURE SUB-GROUP
      Division 30 - RESERVED
      Division 31 - Earthwork
      Division 32 - Exterior Improvements
      Division 33 - Utilities
      Division 34 - Transportation
      Division 35 - Waterway and Marine Construction
      Division 36 - RESERVED
      Division 37 - RESERVED
      Division 38 - RESERVED
      Division 39 - RESERVED

   PROCESS EQUIPMENT SUB-GROUP

     Division 40 - Process Integration
     Division 41 - Material Processing and Handling Equipment
     Division 42 - Process Heating, Cooling and Drying Equipment
     Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
     Division 44 - Pollution Control Equipment
     Division 45 - Industry Specific Manufacturing Equipment
     Division 46 - RESERVED
     Division 47 - RESERVED
     Division 48 - Electrical Power Generation
     Division 49 - RESERVED

For a complete listing of all sub-divisions visit http://www.csinet.org/s_csi/docs/9400/9361.pdf

Construction Specifications Institute
 

 

Dezignaré Interior Design Collective, Inc.


T:
F:
E:
W: dezignare.com
©1998-2008 All Rights Reserved

Dezignare Interior Design Collective